Автор Тема: Detailed construction steps  (Прочитано 160 раз)

Оффлайн merehan

  • Новичок
  • Сообщений: 45
Detailed construction steps
« : 02 Апрель 2023, 08:10:34 »
Detailed construction steps
Providing a plot of land with a suitable area to accommodate the building on which it will be built, and it must be registered and fulfill all the required legal conditions such as licensing, identification and planning.
Complete building plans and have them approved by the official authorities.
Go to the survey office approved by the responsible authorities, to make a sketch of the area of ​​the plot of land and determine its boundaries.

Initiation of earth excavation works according to the maps or as needed based on the opinion of the executing engineer, the consultant engineer or the municipal engineer, and the earth excavation process includes all the operations of tamping and leveling the land.
Planning the excavated land in preparation for laying the floors of the concrete bases (foundations) in the places designated for them.

Installing special molds, or what is known as diamonds, in preparation for pouring concrete into the bases.
Installing reinforcing steel in the foundations and base of the building and parts of the columns.
Preparing the concrete using (concrete mixers), then pouring it into the foundations of the building, and leaving it for several days until it is completely dry, and its texture becomes solid, taking into account the attention to the foundations poured into the concrete according to the engineering. rules.

Installing frame molds for concrete columns so that the length of these molds does not exceed a meter, until the columns appear, then the column molds are poured with concrete, and left for a day or two to dry before being dismantled.
After dismantling all the tires, the pit is filled with layers, taking into account the compaction of these layers well so that their thickness does not exceed 30 or 40 cm, i.e. to the level of installing the piles between the bases.

Rebar and molds are added, and an intermediate amount of concrete is added between the bases.
Dismantling the formwork and completing the process of filling the pit completely and backfilling between the beds as well.
Completing the process of installing reinforcing steel for columns and pouring the entire floor of the building with cement.
Installing the wooden molds for the columns and pouring them with concrete, then dismantling the wooden molds one or two days after the casting process.

- Brick and stone masonry walls and pour concrete between them.
Installing ceiling molds and beams, then installing reinforcing steel on top of them, and after installing reinforcing steel, pouring concrete on them.
In this way, the external structure of the building is completed, and the wooden formwork is dismantled two weeks after the concrete pouring process, and then the internal finishing works begin.​

TRANSLATED FROM:
طريقة تركيب الحجر الهاشمى
كم سعر الحجر الصناعي مع التركيب في مصر
اسعار الطوب الحراري للديكور